This adds the full Atlas (总助 Claw / 老板视角项目执行雷达) scaffolding as a sibling profile to the existing Vega general-purpose assistant. All Atlas content lives under atlas/ to keep the existing top-level skeleton intact. What's included: - atlas/IDENTITY.md, SOUL.md, USER.md, AGENTS.md, MEMORY.md, BOOTSTRAP.md, HEARTBEAT.md, TOOLS.md (+ zh-CN mirrors) — full OpenClaw 8-piece set matching the zero-cca convention - atlas/skills/ — 6 sub-skills with frontmatter: claw-email-parser / claw-project-tracker / claw-people-observer / claw-customer-radar / claw-boss-distiller / claw-report-writer - atlas/skills/claw-boss-distiller/ — adapter notes for nuwa-skill, 5-layer boss_skill seed template (23 rules across Expression DNA / Mental Models / Decision Heuristics / Anti-Patterns / Honest Boundaries), and a complete synthetic distillation demo (10 input emails -> validated 5-layer output) - atlas/mcp-tools/email-extractor/ — Python implementation of stages 1-3 (fetch + decode + dequote), 7 pytest tests passing, CLI: atlas-extract - atlas/state-schemas/ — formal JSON schemas for project / person / customer cards with the no-employee-rating hard constraint baked in - atlas/client-deck/ — 2-page client-facing pitch document - autopilots/atlas-*.yaml — 5 autopilot configs (daily / weekly / monthly / quarterly + andon event-triggered) for a future Multica-side scheduler Notes: - nuwa-skill (MIT, https://github.com/alchaincyf/nuwa-skill) NOT vendored; fetch at deploy time via instructions in atlas/skills/claw-boss-distiller/upstream/README.md - Vega-side prompts/skills/tools/autopilots/docs scaffold left untouched - Top-level README.md updated with a brief Atlas pointer; rest preserved
3.6 KiB
3.6 KiB
| name | description |
|---|---|
| claw-project-tracker | Cluster threads into project entities, apply GTD/RACI logic, judge project state (Active/Stalled/Completed/Someday/Dropped) with rule citations. |
claw-project-tracker
Purpose
The middle of Atlas's pipeline. Reads canonical Email JSON, groups threads into projects, maintains the state/projects/ cards, and applies the boss's boss_skill.md rules to judge state.
Inputs
- All Email JSON in
state/extracted/newer thanstate/projects/.last_processed - Current
state/projects/*.json boss_skill.md(decision heuristics layer)
Outputs
- Updated
state/projects/PRJ-*.json(see schema in../../state-schemas/project.md) - New
state/projects/PRJ-*.jsonfor newly-detected projects state/unclustered/<thread_id>.jsonfor threads that won't cluster- Audit row per state transition into
state/audit/project_transitions.csv
Project Detection
A "project" emerges from a cluster of threads sharing:
- Stable subject keyword (after normalization)
- Stable participant set (≥ 2 of the original participants persist across threads)
- Time continuity (gap < 60 days)
- Optional: explicit project tag from boss (
#PRJ-XXXin subject or first message)
Atlas seeds project IDs as PRJ-YYYY-NNN-<short-name>. The short-name is derived from the most-common project keyword.
State Judgment Rules (default; boss can override via boss_skill.md)
Active := waiting_for.days_overdue ≤ R("stall_threshold_days", default 5)
AND last_action exists
AND not Completed
Stalled := waiting_for.days_overdue > stall_threshold_days
AND no Completed signal
Completed := terminal_keyword_seen("验收|结案|关闭|completed|signed off")
OR boss_explicit_complete = true
Someday := boss_replied_with("先放放|稍后|after Q|不急")
AND days_since_last_action > 30
Dropped := days_since_any_signal > R("drop_threshold_days", default 60)
AND state was Stalled or Someday
Every transition writes to state/audit/project_transitions.csv with: timestamp, project_id, from_state, to_state, rule_refs, source_email_ids.
RACI Inference
- Responsible = most frequent internal sender + receiver in thread
- Accountable = boss-tagged or boss-cc'd internal person who owns delivery
- Consulted = internal cc'd ≥ 30% of messages
- Informed = boss (always) + anyone cc'd < 30%
Missing Accountable for an Active or Stalled project = automatic R-RACI-A-missing flag, surface in Brief.
Failure Modes
| Failure | Behavior |
|---|---|
| Thread refuses to cluster | Move to state/unclustered/, surface in Brief weekly |
| Project ID collision | Append -2, log warning |
| Boss explicitly merges projects via override | Atomic merge, archive both originals to state/projects/.merged/ |
Sample Output
{
"id": "PRJ-2025-001-客户A官网改版",
"name": "客户A 官网改版",
"客户方": "CUST-clientco",
"raci": {
"responsible": ["张三"],
"accountable": "李四",
"consulted": ["设计部"],
"informed": ["Boss"]
},
"gtd": {
"next_action": "等张三发出修改稿 v3",
"waiting_for": {"who": "张三", "since": "2026-04-28", "days_overdue": 11},
"状态": "Stalled"
},
"落地率判定": {
"结论": "Stalled",
"依据": ["GTD-WF: 11 天无回复(阈值 5)", "R-37: 客户主动催办 2 次"],
"置信度": 0.82,
"source_email_ids": ["msg-abc", "msg-def"]
},
"时间线": [...],
"金额": 120000,
"下一步建议": "Boss 亲自 ping 张三 + cc 李四,表明 deadline"
}